Supplier quotes and landed cost
How to Compare Quotes from Multiple Chinese Suppliers Fairly
Send one clear brief, compare first-order costs at the same destination, and check what each supplier can actually deliver.
The short answer
Give every supplier the same product specification, quantity by variant, packaging requirements, and delivery basis. Then compare the total cost to the same destination, the cash you have to commit, and the evidence that each supplier can deliver what it quoted. A lower unit price is not a saving if it leaves out packaging, requires more stock, or covers a different product.
Keep two columns for each offer: what the supplier has confirmed in writing and what you have estimated independently. Mark missing items as open, not zero. If a material difference cannot be resolved, label the offer as an alternative rather than ranking it alongside the others.
1. Send the same brief to every supplier
Give the brief a revision date. Specify the material or grade, dimensions and tolerances, finish, branding, packaging, intended use, and destination market. Include reference photos, drawings, or a sample where useful, and say which details are mandatory and which can change. A reference photo is not a specification: identify what you expect the supplier to match.
Ask each supplier to quote your realistic first-order quantity and the same reorder tier, with the same split by size, colour, or SKU. If a supplier cannot meet that mix, record its actual minimum and the reason. Ask suppliers to quote the requested specification first and price substitutions separately. If you change a mandatory requirement after speaking to one supplier, give the revised brief to all shortlisted suppliers.
For a product with custom retail packaging, ask for minimums and charges separately for the finished product and each pack component. Our custom packaging MOQ guide explains how an inexpensive per-unit price can still leave you paying for unused boxes or inserts.
2. Put the quotes in one comparison sheet
Use one column per supplier. Capture the quotation date, version, currency and validity first, then fill in these rows. Keep the original supplier offer alongside the comparison so it is clear where each figure came from.
| Comparison row | What to record | When to request a revision |
|---|---|---|
| Product and packaging | Brief revision, material, finish, accessories, retail pack and export carton | A substitution or omission is hidden in the unit price |
| Quantity and unit price | Currency, units per SKU, order minimum and unit price at each common tier | The price assumes a different quantity or variant mix |
| Upfront and repeat fees | Samples, revisions, tooling, print setup, tooling custody and credits | A charge or credit is unconfirmed, or its timing is unclear |
| Delivery and freight | Trade term, named point, carton count, dimensions, gross weight and delivery exclusions | The delivery point is missing or freight is based on different pack data |
| Timing and payment | Sample and bulk lead times, when the clock starts, deposit and balance milestones | A promised date omits sample approval, holidays, or transit |
| Quality and remedies | Production reference sample, acceptance criteria, inspection or testing scope, defect remedies | The quote does not say what will be checked or who handles failures |
Record a common exchange-rate date and show any currency or payment fees separately. Keep sample credits out of the confirmed total until the supplier states when and how they apply. See the sampling guide and tooling ownership guide for what to clarify before paying upfront fees.
3. Compare the first shipment at the same destination
Under ICC Incoterms 2020, the trade term affects which party bears specified transport and customs responsibilities. Write the rule, exact named place or port, and edition on each quote. An EXW factory price and a DDP quote to your warehouse do not cover the same work. If the terms differ, either get revised quotes on one basis or price the missing steps to the same destination with a forwarder.
First-order cash estimate = goods and packaging + upfront project costs + buyer-paid freight and insurance + applicable clearance, duties, taxes and local delivery + separately budgeted checks or fees. Include only costs you actually expect to pay and do not add anything already included. Divide by the same planned number of accepted, sellable units for a comparable per-unit estimate.
Show first-order cash and repeat-order cost separately. If import tax might be recoverable, keep it visible in the cash estimate and show the potential recovery separately, subject to confirmation. Duties, taxes and import charges depend on the shipment and destination; have an appropriate customs broker verify the classification and applicable charges. The U.S. International Trade Administration's tariffs and fees overview explains why a tariff alone does not represent landed cost. See our EXW, FOB and DDP comparison for delivery-point questions.
Worked example: the cheaper unit price costs more on the first order
Illustrative figures only, not market prices: for the same 500 sellable units, Offer A lists $4.00 per unit, $300 for retail packaging, $200 in setup, and $600 in estimated buyer-paid delivery and import costs. The estimate is $3,100, or $6.20 per unit. Offer B lists $4.40 with retail packaging included, $100 in setup, and $550 in estimated buyer-paid delivery and import costs. That is $2,850, or $5.70 per unit. Recheck the assumptions before using the $250 difference to make a decision.
4. Resolve the differences that could change the decision
- Compare the actual cash commitment. A price at a higher MOQ may tie up more money in a slow-moving colour or pack. Show that offer as a separate scenario and list the units you will hold beyond the planned launch.
- Confirm who does the work. Ask who produces, finishes and packs the item, what is subcontracted, and whether the sample represents the proposed production process. Use our factory verification guide to decide what evidence to request.
- Do not rank an unverified specification by price. Treat an unconfirmed material, tolerance or required test as an open condition. A sample check, a production inspection and lab testing are different checks; see the quality checks guide.
- Check payment and delivery exposure. Compare how much is due before sample approval, inspection, and dispatch. Confirm when lead time starts and whether the quotation means ex-factory readiness or arrival at the destination.
When the numbers are close, ask which unresolved assumption could reverse the ranking. Request evidence for that assumption first. Before placing an order, carry the final brief revision, itemised quote, delivery point, accepted sample and agreed remedies into the order documents.
Comparing an Alibaba.com export quote with a 1688 listing? See our 1688 vs Alibaba guide for the payment, receiving and export steps to confirm before comparing totals.
Frequently asked questions
What if two suppliers will not quote the same minimum order?
Do not extrapolate a quantity discount. Show the actual available order for each supplier, its first-order cash total and its inventory commitment. If you need the smaller order, treat the larger offer as an alternative, not a direct comparison.
How do I compare a supplier's delivered offer with my own freight estimate?
Match the destination, carton data, transport mode, delivery window, and included charges. Ask who handles import clearance and confirm what the carrier or broker has not priced. Until those items are aligned, keep both figures provisional.
Already have competing quotes?
Find out what each price actually covers.
Share your product brief, target quantities, destination and supplier quotations, with sensitive details removed if needed. Linkbase can help organise supplier-side clarifications and compare what each offer includes.